Tender No. Unit.
Item/ Nature Of Work.
Description
Mode Of Tendering/Type Of Bidding Date Of Publi-cation Of NITLast Date Of receipt Of TenderNos. Of tenders recordedNames of parties qualified after techno- Commercial evaluationNames of parties Not qualified after techno- Commercial evaluationWhether contract awarded to lowest tenderer/ evaluated L1Contract No / Contract Date.Name Of the ContractorValue Of the Contract Start Date completion Date
NBC/MM/510/8000000295/TSS/PT/2017 Corporate Office

Others

Programmable Electronic Safety Stop System for Cable Belt Conveyor
Global / Two 08-Nov-201706-Dec-20174 Ampcontrol CSM Pty Ltd.

TPS Automation Pvt. Ltd.

Arihant Elsys Pvt. Ltd.

Bramco Electronics Pty Ltd.

Yes

4500046076 & 5100000917
11-Apr-2018

Arihant Elsys Pvt. Ltd.(offloaded by )
Programmable Electro

7.84108e+009

11-Apr-2018

10-Apr-2019

OMC-4790 Smelter Division

Others

Transportation And Disposal of Hazardous Waste of Rodding Shop to CHWTSDF
Single / --Select B 02-Feb-201817-Feb-20181 Ramky Enviro Engineers Limited.

-- Yes

PO NO-5200002500/WO/5478
18-Apr-2018

Ramky Enviro Engineers Limited.(offloaded by )
Transportation And D

2.38896e+007

23-Apr-2018

22-Apr-2020

OMC-4805 Smelter Division

Others

Construction of New Substation 18.1 at Rodding Shop-1 inside Smelter Plant.
Limited / --Select B 16-Feb-201805-Mar-201810 P.G. Construction

National Builders

Sri Arupa Construction

Binayak Construction

Kamalesh Construction Pvt. Ltd.

J.K. Construction

Kamadevi Enterprisers

A.P.S. Construction

Power Enterprisers

Dinesh Enterprisers

-- Yes

OMC-4805/5100000916/WO/5474
07-Apr-2018

Dinesh Enterprisers (offloaded by )
New Substation 18.1

3.39594e+006

10-Apr-2018

09-Feb-2019

OMC - 4791 Smelter Division

Others

Providing Fixing of RCC Precast Slab and Insulating Slabs of Pot Rooms
Limited / --Select B 25-Jan-201812-Feb-201810 BINAYAK CONSTRUCTION

MAA MANGALA CONSTRUCTION

NATIONAL BUILDERS

P.G. CONSTRUCTION

P.K. SAMAL.

SANTOSH ENTERPRISES

SRI ARUPA CONSTRUCTION

SRI GURU ENTERPRISERS.

HARI CHANDAN BISWAL

RANJAN KUMAR BHUTIA

Yes

OMC-4791/5300002830/WO/5474
02-Apr-2018

MAA MANGALA CONSTRUCTION(offloaded by )
RCC Precast Slab

2.7705e+006

23-May-2018

22-May-2020

OMC-4799 Smelter Division

Others

Mosquito and Termite Control Services at Township and CISF Colony.
Limited / --Select B 03-Feb-201823-Feb-20182 CHANDI PEST CONTROL and CO.

OMM CONSTRUCTION

-- Yes

OMC-4799/5300002883/WO/5480
24-Apr-2018

CHANDI PEST CONTROL and CO.(offloaded by )
MOSQUIOTO TERMITE

2.19664e+006

22-Jun-2018

21-Jun-2020

OMC-4774 Smelter Division

Others

Development of Drawing and Services for Capital Repair Group of Smelter Plant.
Limited / --Select B 09-Jan-201824-Jan-20183 Eastend Technolgies Pvt. Ltd.

Indfab

Design Crafts India

-- Yes

OMC-4774/5300002897/WO/5485
28-Apr-2018

Eastend Technolgies Pvt. Ltd.(offloaded by )
CRG CONTRACT

5.44035e+006

02-May-2018

01-May-2020

OMC-4752 Smelter Division

Others

Packaging of Wire Rod Coils (9.5MM / 12 MM Wire Rods)
Open / Two 17-Nov-201715-Dec-20173 MAMA ENTERPRISES

FROMM PACKGING SYSTEMS INDIA PVT LTD.

RANJEET CONSTRUCTION.

Yes

PO NO- 5300002889/WO/5482
27-Apr-2018

MAMA ENTERPRISES(offloaded by )
Packaging of Wire Ro

4.145e+007

02-May-2018

01-May-2020

MC-4587 CPP Division

Others

CONSTRUCTION OF WORKSHOP CUM OFFICE FOR MECHANICAL DEPARTMENT IN NEW CHP OFFICE AREA.
Open / --Select B 10-Jan-201807-Feb-20184 Ms Dinesh Enterprisers

Ms P.K.Samal

Ms Binayak Construction

Ms A.C.Barah

Yes

CPP/T&C/C08/MC-4587/5100000926/1062
21-Apr-2018

Ms Dinesh Enterprisers(offloaded by )
06 MONTHS

1.88052e+006

16-Mar-2018

15-Sep-2018

MC-4574 CPP Division

Others

ANNUAL MAINTENANCE CONTRACT FOR BOMB CALORIMETERS MODEL 6100 6200, MAKE-PARR INSTRUMENTS
Proprietary / One Part 05-Jan-201817-Jan-20181 Ms Orbit Technologies Pvt Ltd

-- Yes

CPP/T&C/C07/MC-07/MC-4574/5300002836/1034
18-Apr-2018

Ms Orbit Technologies Pvt Ltd(offloaded by )
02 YEARS

230000

02-May-2018

01-May-2020

MC-4576 CPP Division

Others

OVERHAULING,REPAIR MAINTENANCE OF AC VENTILATION FIRE FIGHTING SYSTEM OF UNIT1 TO 10
Open / Two Part 05-Jan-201831-Jan-20185 Ms Singh Constructor

Ms Chaitanya Majhi

Ms Sidharth Engineering

Ms Fab Erectors

Ms J.B.Construction

-- Yes

CPP/T&C/C07/MC-4576/5300002832/1058
21-Apr-2018

Ms Singh Constructor(offloaded by )
02 YEARS

4.88664e+006

01-Apr-2018

31-Mar-2020